{"id":266,"date":"2016-11-19T16:45:23","date_gmt":"2016-11-19T15:45:23","guid":{"rendered":"https:\/\/www.eppc.fr\/?p=266"},"modified":"2017-10-31T14:56:55","modified_gmt":"2017-10-31T13:56:55","slug":"redeveloppement-centre-commercial-bobigny-2-programme-urbain-mixte-de-centre-ville","status":"publish","type":"post","link":"https:\/\/www.eppc.fr\/en\/redeveloppement-centre-commercial-bobigny-2-programme-urbain-mixte-de-centre-ville\/","title":{"rendered":"Redevelopment of the Bobigny 2 shopping center into a mixed urban center program"},"content":{"rendered":"<p>At the request of the condominium, EPPC intervened as of mid-2015 in order to<\/p>\n<ul>\n<li>structure a consultation with operators \u2013 investors for the overall acquisition of the site and its valorization as a mixed-use project with a residential focus,<\/li>\n<li>develop and negotiate partnership agreements,<\/li>\n<li>analyse the offers produced in terms of programming and financing.<\/li>\n<\/ul>\n<p>Three groups were interviewed in 2016 (Altarea Cogedim, Linkcity Icade, Sogeprom Kaufman &amp; Broad).<\/p>\n<p>Following a selection process, Altarea Cogedim Grands Projets was declared the winner by the co-ownership and an agreement protocol was signed on 14\/11\/2016 with the investment operator, allowing the launch of the operational studies. These studies will be supervised by a monitoring committee, coordinated by EPPC, in order to guarantee the co-owners the conclusion of sales promises and the lifting of their suspensive conditions as soon as possible.<\/p>\n<p>Altarea Cogedim, supported by the TVK agency, urban planning consultant, will carry out the entire project and will conclude a PUP agreement with the City of Bobigny and the Territoire Est Ensemble in order to participate in the public infrastructure made necessary by the implementation of the project.<\/p>\n<p><a href=\"https:\/\/www.eppc.fr\/wp-content\/uploads\/2017\/10\/Image1.png\" target=\"_blank\" rel=\"noopener\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-267 size-medium\" src=\"https:\/\/www.eppc.fr\/wp-content\/uploads\/2017\/10\/Image1-300x215.png\" alt=\"\" width=\"300\" height=\"215\" srcset=\"https:\/\/www.eppc.fr\/wp-content\/uploads\/2017\/10\/Image1-300x215.png 300w, https:\/\/www.eppc.fr\/wp-content\/uploads\/2017\/10\/Image1-768x549.png 768w, https:\/\/www.eppc.fr\/wp-content\/uploads\/2017\/10\/Image1-1024x733.png 1024w, https:\/\/www.eppc.fr\/wp-content\/uploads\/2017\/10\/Image1.png 1184w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>The project, carried out in two phases, will include approximately 13,000 m\u00b2 of retail space and cinema, 1,170 family housing units and a service residence, 10,500 m\u00b2 of office space, served by new public spaces and located in the immediate vicinity of the stations of the 5th metro line, the 1st tramway line and the future Grand Paris Express station of the 15th line.<\/p>\n<p>This operation is exemplary in several respects:<\/p>\n<ul>\n<li>it demonstrates the ability to overcome the obstacles to the redevelopment of a commercial site in serious difficulty by seeking dense, mixed-use and residential-oriented real estate developments,<\/li>\n<li>it illustrates the necessary establishment of operational partnerships involving public and private operators to realize complex valorization projects,<\/li>\n<li>it constitutes a reference operation for EPPC in the direction of projects, mediation between public and private actors, co-owners and candidates, analysis of programmatic and financial offers, and negotiation of operational agreements.<\/li>\n<\/ul>","protected":false},"excerpt":{"rendered":"<p>A la demande de la copropri\u00e9t\u00e9, EPPC est intervenu \u00e0 compter de mi 2015 afin de structurer une consultation d&rsquo;op\u00e9rateurs &#8211; investisseurs pour l&rsquo;acquisition globale du site et sa valorisation en programme mixte \u00e0 dominante r\u00e9sidentielle, mettre au point et n\u00e9gocier les conventions de partenariat, analyser les offres produites en mati\u00e8re programmatique et financi\u00e8re. Trois [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":267,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[10],"tags":[],"class_list":["post-266","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-actualite"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.6 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Red\u00e9veloppement du Centre commercial Bobigny 2 en programme urbain mixte de centre ville - EPPC<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.eppc.fr\/en\/redeveloppement-centre-commercial-bobigny-2-programme-urbain-mixte-de-centre-ville\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Red\u00e9veloppement du Centre commercial Bobigny 2 en programme urbain mixte de centre ville - EPPC\" \/>\n<meta property=\"og:description\" content=\"A la demande de la copropri\u00e9t\u00e9, EPPC est intervenu \u00e0 compter de mi 2015 afin de structurer une consultation d&rsquo;op\u00e9rateurs &#8211; investisseurs pour l&rsquo;acquisition globale du site et sa valorisation en programme mixte \u00e0 dominante r\u00e9sidentielle, mettre au point et n\u00e9gocier les conventions de partenariat, analyser les offres produites en mati\u00e8re programmatique et financi\u00e8re. Trois [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.eppc.fr\/en\/redeveloppement-centre-commercial-bobigny-2-programme-urbain-mixte-de-centre-ville\/\" \/>\n<meta property=\"og:site_name\" content=\"EPPC\" \/>\n<meta property=\"article:published_time\" content=\"2016-11-19T15:45:23+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2017-10-31T13:56:55+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.eppc.fr\/wp-content\/uploads\/2017\/10\/Image1.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1184\" \/>\n\t<meta property=\"og:image:height\" content=\"847\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"pixem\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"pixem\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.eppc.fr\\\/redeveloppement-centre-commercial-bobigny-2-programme-urbain-mixte-de-centre-ville\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.eppc.fr\\\/redeveloppement-centre-commercial-bobigny-2-programme-urbain-mixte-de-centre-ville\\\/\"},\"author\":{\"name\":\"pixem\",\"@id\":\"https:\\\/\\\/www.eppc.fr\\\/#\\\/schema\\\/person\\\/8e49ba5f360d7a6da059ba637840519d\"},\"headline\":\"Red\u00e9veloppement du Centre commercial Bobigny 2 en programme urbain mixte de centre ville\",\"datePublished\":\"2016-11-19T15:45:23+00:00\",\"dateModified\":\"2017-10-31T13:56:55+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.eppc.fr\\\/redeveloppement-centre-commercial-bobigny-2-programme-urbain-mixte-de-centre-ville\\\/\"},\"wordCount\":379,\"image\":{\"@id\":\"https:\\\/\\\/www.eppc.fr\\\/redeveloppement-centre-commercial-bobigny-2-programme-urbain-mixte-de-centre-ville\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.eppc.fr\\\/wp-content\\\/uploads\\\/2017\\\/10\\\/Image1.png\",\"articleSection\":[\"Actualit\u00e9s\"],\"inLanguage\":\"en-GB\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.eppc.fr\\\/redeveloppement-centre-commercial-bobigny-2-programme-urbain-mixte-de-centre-ville\\\/\",\"url\":\"https:\\\/\\\/www.eppc.fr\\\/redeveloppement-centre-commercial-bobigny-2-programme-urbain-mixte-de-centre-ville\\\/\",\"name\":\"Red\u00e9veloppement du Centre commercial Bobigny 2 en programme urbain mixte de centre ville - EPPC\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.eppc.fr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.eppc.fr\\\/redeveloppement-centre-commercial-bobigny-2-programme-urbain-mixte-de-centre-ville\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.eppc.fr\\\/redeveloppement-centre-commercial-bobigny-2-programme-urbain-mixte-de-centre-ville\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.eppc.fr\\\/wp-content\\\/uploads\\\/2017\\\/10\\\/Image1.png\",\"datePublished\":\"2016-11-19T15:45:23+00:00\",\"dateModified\":\"2017-10-31T13:56:55+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.eppc.fr\\\/#\\\/schema\\\/person\\\/8e49ba5f360d7a6da059ba637840519d\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.eppc.fr\\\/redeveloppement-centre-commercial-bobigny-2-programme-urbain-mixte-de-centre-ville\\\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.eppc.fr\\\/redeveloppement-centre-commercial-bobigny-2-programme-urbain-mixte-de-centre-ville\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/www.eppc.fr\\\/redeveloppement-centre-commercial-bobigny-2-programme-urbain-mixte-de-centre-ville\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.eppc.fr\\\/wp-content\\\/uploads\\\/2017\\\/10\\\/Image1.png\",\"contentUrl\":\"https:\\\/\\\/www.eppc.fr\\\/wp-content\\\/uploads\\\/2017\\\/10\\\/Image1.png\",\"width\":1184,\"height\":847},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.eppc.fr\\\/redeveloppement-centre-commercial-bobigny-2-programme-urbain-mixte-de-centre-ville\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\\\/\\\/www.eppc.fr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Red\u00e9veloppement du Centre commercial Bobigny 2 en programme urbain mixte de centre ville\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.eppc.fr\\\/#website\",\"url\":\"https:\\\/\\\/www.eppc.fr\\\/\",\"name\":\"EPPC\",\"description\":\"Conseil en d\u00e9veloppement de projets immobiliers\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.eppc.fr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.eppc.fr\\\/#\\\/schema\\\/person\\\/8e49ba5f360d7a6da059ba637840519d\",\"name\":\"pixem\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/0b4d737f7a941f9b90a98b4228d9e9798b0c41179ab1e0746f0844e3ad562ba2?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/0b4d737f7a941f9b90a98b4228d9e9798b0c41179ab1e0746f0844e3ad562ba2?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/0b4d737f7a941f9b90a98b4228d9e9798b0c41179ab1e0746f0844e3ad562ba2?s=96&d=mm&r=g\",\"caption\":\"pixem\"},\"url\":\"https:\\\/\\\/www.eppc.fr\\\/en\\\/author\\\/olivier\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Red\u00e9veloppement du Centre commercial Bobigny 2 en programme urbain mixte de centre ville - EPPC","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.eppc.fr\/en\/redeveloppement-centre-commercial-bobigny-2-programme-urbain-mixte-de-centre-ville\/","og_locale":"en_GB","og_type":"article","og_title":"Red\u00e9veloppement du Centre commercial Bobigny 2 en programme urbain mixte de centre ville - EPPC","og_description":"A la demande de la copropri\u00e9t\u00e9, EPPC est intervenu \u00e0 compter de mi 2015 afin de structurer une consultation d&rsquo;op\u00e9rateurs &#8211; investisseurs pour l&rsquo;acquisition globale du site et sa valorisation en programme mixte \u00e0 dominante r\u00e9sidentielle, mettre au point et n\u00e9gocier les conventions de partenariat, analyser les offres produites en mati\u00e8re programmatique et financi\u00e8re. Trois [&hellip;]","og_url":"https:\/\/www.eppc.fr\/en\/redeveloppement-centre-commercial-bobigny-2-programme-urbain-mixte-de-centre-ville\/","og_site_name":"EPPC","article_published_time":"2016-11-19T15:45:23+00:00","article_modified_time":"2017-10-31T13:56:55+00:00","og_image":[{"width":1184,"height":847,"url":"https:\/\/www.eppc.fr\/wp-content\/uploads\/2017\/10\/Image1.png","type":"image\/png"}],"author":"pixem","twitter_card":"summary_large_image","twitter_misc":{"Written by":"pixem","Estimated reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.eppc.fr\/redeveloppement-centre-commercial-bobigny-2-programme-urbain-mixte-de-centre-ville\/#article","isPartOf":{"@id":"https:\/\/www.eppc.fr\/redeveloppement-centre-commercial-bobigny-2-programme-urbain-mixte-de-centre-ville\/"},"author":{"name":"pixem","@id":"https:\/\/www.eppc.fr\/#\/schema\/person\/8e49ba5f360d7a6da059ba637840519d"},"headline":"Red\u00e9veloppement du Centre commercial Bobigny 2 en programme urbain mixte de centre ville","datePublished":"2016-11-19T15:45:23+00:00","dateModified":"2017-10-31T13:56:55+00:00","mainEntityOfPage":{"@id":"https:\/\/www.eppc.fr\/redeveloppement-centre-commercial-bobigny-2-programme-urbain-mixte-de-centre-ville\/"},"wordCount":379,"image":{"@id":"https:\/\/www.eppc.fr\/redeveloppement-centre-commercial-bobigny-2-programme-urbain-mixte-de-centre-ville\/#primaryimage"},"thumbnailUrl":"https:\/\/www.eppc.fr\/wp-content\/uploads\/2017\/10\/Image1.png","articleSection":["Actualit\u00e9s"],"inLanguage":"en-GB"},{"@type":"WebPage","@id":"https:\/\/www.eppc.fr\/redeveloppement-centre-commercial-bobigny-2-programme-urbain-mixte-de-centre-ville\/","url":"https:\/\/www.eppc.fr\/redeveloppement-centre-commercial-bobigny-2-programme-urbain-mixte-de-centre-ville\/","name":"Red\u00e9veloppement du Centre commercial Bobigny 2 en programme urbain mixte de centre ville - EPPC","isPartOf":{"@id":"https:\/\/www.eppc.fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.eppc.fr\/redeveloppement-centre-commercial-bobigny-2-programme-urbain-mixte-de-centre-ville\/#primaryimage"},"image":{"@id":"https:\/\/www.eppc.fr\/redeveloppement-centre-commercial-bobigny-2-programme-urbain-mixte-de-centre-ville\/#primaryimage"},"thumbnailUrl":"https:\/\/www.eppc.fr\/wp-content\/uploads\/2017\/10\/Image1.png","datePublished":"2016-11-19T15:45:23+00:00","dateModified":"2017-10-31T13:56:55+00:00","author":{"@id":"https:\/\/www.eppc.fr\/#\/schema\/person\/8e49ba5f360d7a6da059ba637840519d"},"breadcrumb":{"@id":"https:\/\/www.eppc.fr\/redeveloppement-centre-commercial-bobigny-2-programme-urbain-mixte-de-centre-ville\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.eppc.fr\/redeveloppement-centre-commercial-bobigny-2-programme-urbain-mixte-de-centre-ville\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.eppc.fr\/redeveloppement-centre-commercial-bobigny-2-programme-urbain-mixte-de-centre-ville\/#primaryimage","url":"https:\/\/www.eppc.fr\/wp-content\/uploads\/2017\/10\/Image1.png","contentUrl":"https:\/\/www.eppc.fr\/wp-content\/uploads\/2017\/10\/Image1.png","width":1184,"height":847},{"@type":"BreadcrumbList","@id":"https:\/\/www.eppc.fr\/redeveloppement-centre-commercial-bobigny-2-programme-urbain-mixte-de-centre-ville\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/www.eppc.fr\/"},{"@type":"ListItem","position":2,"name":"Red\u00e9veloppement du Centre commercial Bobigny 2 en programme urbain mixte de centre ville"}]},{"@type":"WebSite","@id":"https:\/\/www.eppc.fr\/#website","url":"https:\/\/www.eppc.fr\/","name":"EPPC","description":"Consulting on the development of real estate projects","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.eppc.fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Person","@id":"https:\/\/www.eppc.fr\/#\/schema\/person\/8e49ba5f360d7a6da059ba637840519d","name":"pixem","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/secure.gravatar.com\/avatar\/0b4d737f7a941f9b90a98b4228d9e9798b0c41179ab1e0746f0844e3ad562ba2?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/0b4d737f7a941f9b90a98b4228d9e9798b0c41179ab1e0746f0844e3ad562ba2?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/0b4d737f7a941f9b90a98b4228d9e9798b0c41179ab1e0746f0844e3ad562ba2?s=96&d=mm&r=g","caption":"pixem"},"url":"https:\/\/www.eppc.fr\/en\/author\/olivier\/"}]}},"_links":{"self":[{"href":"https:\/\/www.eppc.fr\/en\/wp-json\/wp\/v2\/posts\/266","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.eppc.fr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.eppc.fr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.eppc.fr\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.eppc.fr\/en\/wp-json\/wp\/v2\/comments?post=266"}],"version-history":[{"count":9,"href":"https:\/\/www.eppc.fr\/en\/wp-json\/wp\/v2\/posts\/266\/revisions"}],"predecessor-version":[{"id":341,"href":"https:\/\/www.eppc.fr\/en\/wp-json\/wp\/v2\/posts\/266\/revisions\/341"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.eppc.fr\/en\/wp-json\/wp\/v2\/media\/267"}],"wp:attachment":[{"href":"https:\/\/www.eppc.fr\/en\/wp-json\/wp\/v2\/media?parent=266"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.eppc.fr\/en\/wp-json\/wp\/v2\/categories?post=266"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.eppc.fr\/en\/wp-json\/wp\/v2\/tags?post=266"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}